Ricardo MTC
 |
CLIENT:
Ricardo
LOCATION:
Midland Technical Centre - Leamington Spa
|
SCOPE OF WORK:
| |
Major two storey refurbishment involving structured
cabling, 300 floor boxes supplying three Cat5e network connections
plus 13 amp power, new three phase distribution boards and a
communications room complete with a 19 inch cabinet suite |
| |
Installation of 12-core multimode and 8-core
single mode campus fibre connectivity |
| |
200 pair voice tie cable installation providing
cross-site connectivity from telephone switch to serve structured
cabling voice applications |
| |
Major office refurbishment for one hundred users
involving a new ceiling grid, a Cat2 lighting scheme, new three
phase distribution boards, Cat5e structured cabling and small
power circuitry |
| |
Reception area refurbishment including structured
cabling, small power and aesthetic lighting schemes |
| |
Workshop refurbishment including installation of three phase supply |
SPECIAL FEATURES:
| |
Benefit from occupancy control lighting system
identified by J&B and approved
by client |
| |
Campus street lighting system implemented, incorporating
direct contract with
civil engineers to reinstate site after installation |
| |
Provision of ceiling grids and carpets incorporated into
J&B remit to provide a
turn-key solution
|
|
|